In the Power Dependency Editor, you can draw a diagram of the entire physical infrastructure supporting the racks, including the power connections.When you open the Power Dependency Editor, some equipment may already be shown in the upper left corner. There may be more components hidden behind the one that is visible. If the diagram is empty, you must configure the physical infrastructure with rooms and equipment first.
This editor includes equipment at PDU level and upstream to the switchgear, and equipment from the PDU and downstream that supports the racks, such as cooling units and pumps. The IT load of the racks is included in the PUE/DCiE calculation as an IT Load subsystem. Infiltration, lighting, and ventilation are also included as subsystems.
You can move the components one at a time from the initial position in the corner. Then you can draw power connections between the components in the diagram to configure the power dependency setup of the entire physical infrastructure.
123 Steps to... |
See also |
---|---|
Configuring power dependencies
|
0 comments
Please sign in to leave a comment.