Installation Requirements pane
The Installation Requirements pane is used for guided addition/repositioning of equipment to the layout. It is available when Planning>Asset Provisioning is selected in the Application bar.
New / Existing Asset info | Provides information about that component, e.g. how much power the equipment draws, how many power cords the equipment has, how much space the equipment takes up in a rack. |
Assign tags | Lists available tags to select and assign to the equipment and rack in the new position in the layout. |
Required Redundancy | Selects the level of redundancy for this piece of equipment in the new position in the layout. |
Required Network Ports | Selects the amount of fiber or copper connections for this piece of equipment in the new position in the layout. |
Add / Move Asset | Adds one or more components to a Selected racks, Each rack in the server room, or Best rack.
|
Show location | Highlights the best location for the selected equipment in the layout. |
0 comments
Please sign in to leave a comment.